Engineering and construction works of the above-ground part of the KN LNG terminal

Client:

PPS Pipeline Systems GmbH (main contractor), AB Klaipėdos nafta

Period:

2013/09 – 2014/12

Project description:

Under subcontract with major contractor – PPS Pipeline Systems GmbH, Elsis TS provided various engineering design and construction services.

  • Detailed design of SCADA and Automation, Telecommunications systems parts.
  • Supply of equipment and Installation of Electricity, Telecommunications, SCADA and HVAC systems in Gas Metering Station (GMS), Valve stations, Jetty and throughout the whole designed length of the pipeline. Pre-commissioning and Commissioning of all installed systems.
  • Onshore works – Gas Metering Station (GMS). Supply of necessary equipment and installation of Station Control and Metering Systems (Schneider Electric ScadaPack300 series RTU, Honeywell PLC, Siemens ESD PLC), HVAC, Indoor and Outdoor Security Systems, Video Surveillance System, Gas Detection System, Automatic Emergency Shutdown System (ESD), Automation-Process Controls equipment, external Electricity, and lighting systems. Installation of wireless (Wi-Fi) connection between GMS and Jetty and GSM connection between GMS and valve stations, including installation of communication tower.  Installation of Automation and SCADA System at GMS stations including SCADA software (TEMEKA) installation.
  • Valve (closing device) stations. Supply of equipment and installation of Automation and SCADA System, Electricity, lighting, grounding, and protection systems at valve stations.
  • Offshore works. Supply of equipment and installation of SCADA and Process Automation systems, ESD system at Jetty. Supply of equipment and Installation of wireless and GSM network connection from the shore to the Jetty, including installation of communication antenna on Jetty