Client:
UAB MT Group (main contractor), Elering AS
Period:
2017/01 – 2017/12
Project description:
Under subcontract with general contractor – MT Group, Elsis TS provided various services during reconstruction of the Varska gas measuring station (Estonia) operated by Elering AS – an independent electricity and gas system operator in Estonia. Elering is moving gas-metering stations (GMSs) towards unmanned and remote management within the framework of the plan to reduce the gas transmission network’s operational costs.
During the project ELSIS TS provided various services and works, including design, delivery, installation and commissioning of power distribution, backup gas power generator, plot and buildings lighting, plot lightning, instrumentation, and process automation (Schneider Electric 500 series PLC), SCADA software (Schneider Electric ClearSCADA), communications, security monitoring, fire detection, video surveillance, gas leakage detection, fiscal metering, gas analytical (chromatography, water and hydrocarbon dew points, oxygen).